Please note that upgrading works at the AMKMC Main Drop-off Point will take place in phases during this period. Please refer to the attached routing plan and follow the designated access routes.

Phase 1 (1 – 10 Sep): Closure of Lift Lobby Entrance
Please enter through the main door outside Sanctuary 1.

Phase 2 (11 Sep – 3 Oct): Closure of Main Door Outside Sanctuary 1
Please enter through the Lift Lobby Entrance.

Phase 3 (3 – 15 Oct): Works Near the Car Park Gantry
All entrances will remain accessible, although the area near the car park gantry will be affected.